Dear Investors,
An eventful 2024 is now behind us—a year in which we achieved important milestones and successfully completed great projects together with you. With over 30 MWp in completed photovoltaic projects, approximately 70 MWp in projects developed and sold, and an impressive pipeline of 694 MWp, we have set the course for sustainable growth.
Now we’re looking ahead: In 2025, in addition to the further development of ground-mounted PV plants, our focus will be on the repowering of some existing plants, battery storage projects, and the finalization of project development for the first substation. We have established the necessary human resources for this and, through strong partnerships, are consistently committed to innovative technologies and sustainable solutions in order to actively help shape the energy transition.
In this issue of the Ranft Report 1/2025, we provide you with an overview of our current projects, new strategic developments, and our plans for the year. Let’s work together to seize the opportunities this year has to offer and continue investing in a future-proof, sustainable energy supply.
Sincerely, Michael Ranft, Andrea Ranft, and Rainer Zepke
EEN PROJECTS IN GERMANY
BESS Project in Oranienbaum
A key element of our project in Oranienbaum is the integration of a high-performance BESS storage solution (6–8 MW), which we are implementing in collaboration with our joint venture, Ampex Blu. The system utilizes highly efficient and proven Huawei lithium-ion storage units that have already demonstrated their performance in the market. The storage system will flexibly store excess energy and release it as needed—an important contribution to grid stability and, among other things, to optimizing self-consumption. This makes the volatile power generation from renewable energy sources more efficient to utilize and noticeably smooths out grid feed-in. Storage solutions like these have long been regarded as a key technology for the energy transition and offer great potential for the future—both environmentally and economically. By combining an expansion of our facilities with state-of-the-art storage technology, we are creating significant added value and sending a strong signal in support of sustainable energy projects in the region. With this project, the Ranft Group underscores its role in developing innovative and forward-looking energy solutions. Further details on this and other projects will follow in upcoming issues of our Ranft Report.
New Pirna Plant, 16.25 MWp
Another exciting milestone is our PV project in Pirna, which is scheduled to be connected to the grid in May 2025. We are already planning to include a large-scale storage facility there as well. Initial plans indicate a capacity of approximately 16 MW and a storage capacity of 32 MWh. Especially in light of the growing demands for grid stability and flexibility, storage technology continues to gain importance. We are still in the early stages of concept development, but we will provide you with regular updates on our progress in upcoming Ranft Reports. One thing is already clear: this project, too, will make an important contribution to sustainable energy supply and long-term value creation.

Planned Repowering Projects
For 2025/2026, we plan to continue repowering existing plants, including several projects from the large PV portfolio we acquired in 2019. The repowering projects include, among others, the Gerwisch, Türkheim, Unterhaselbach, Nordhausen, and Walbeck projects. In addition, new plants are to be built and equipped with battery storage.
EEN PROJECTS ITALY
New Solar Projects in the Veneto and Sicily Regions
In Valeggio sul Mincio (Province of Verona), we have succeeded in securing a site that is particularly well-suited for the development of a solar power project. The site is a former quarry that is now being repurposed as a solar power plant in two construction phases. Italian legislation provides for a simplified permitting process for this type of site, and we are currently preparing the preliminary plans so that we can then use them as the basis for submitting the grid connection request. According to the current planning status, we will construct a solar park with a rated output of 6 megawatts in the first phase. In the municipality of Cassibile, along the Catania–Siracusa highway, we were already able to secure land for a 9.2-megawatt PV project in 2024. We have now received a positive grid connection decision, and the next step will be to prepare the site for construction with our team. Due to their preferential legal status, these sites also qualify for a simplified permitting process, so we expect construction to begin in the second half of 2025.
AMPEXBLU JOINT VENTURE
A key factor in the successful integration of renewable energy is the storage of excess electricity—and thus the flexibility it brings to grid feed-in. With Ampex Blu GmbH, we have established our own joint venture that specializes in the development and implementation of battery energy storage systems (BESS). Ampex Blu covers the entire range of services—from site development and financing to technical engineering and marketing.

Together with Ampex Blu GmbH, we are currently moving forward with several energy storage projects—including the high-performance storage solution for our Oranienbaum PV project. These projects utilize highly efficient lithium-ion storage systems from a well-known manufacturer, as well as AI-based control systems that optimize the systems’ cost-effectiveness and stability.
Through this joint venture, we are specifically strengthening our position as a full-service project developer in the renewable energy sector. Energy storage solutions are considered key to a cost-effective and sustainable energy transition—so we are ideally positioned to actively help shape this future.