“WE’RE IN THE SAME BOAT AS OUR INVESTORS”

In conversation with Managing Director Michael Ranft:

Ranft Invest GmbH issued a solar bond (ISIN: DE000A2LQLH9) back in 2018, maturing in 2030, with a stepped interest rate ranging from 4.75% to 5.25%. The bond has a maximum total volume of 5 million euros. The issuer is currently offering a second tranche with an issue volume of 990,000 euros. We spoke with Michael Ranft, CEO of the Ranft Group, about the group’s development, the bond issue, and the use of the bond proceeds.

Bond Finder: Dear Mr. Ranft, could you briefly introduce the Ranft Group to us? How do you make your money?

Michael Ranft: The Ranft Group was founded in 1996, initially focusing on the development, planning, and construction of real estate projects. Starting in 2003, we began specializing in residential care facilities for seniors and people with disabilities. We have also developed kindergartens and daycare centers. Today, our focus is clearly on renewable energy. On the one hand, we generate revenue from our portfolio of real estate, solar power systems, and hydroelectric power plants, which has grown over many years. The Ranft Group also acts as a project developer, general contractor, and plant operator. In addition, we serve as a service provider for monitoring as well as commercial and technical operations management for third parties. As a rule, we add one-third of the projects we develop or acquire on the secondary market to the Group’s own portfolio, while two-thirds are transferred to long-standing business partners. In principle, we continue to manage the entire PV portfolio created or generated through our activities.

In addition, we operate 10 hydroelectric power plants that we built in Italy; two more are currently under construction, and several others are in the planning stages. Geographically, Germany and Italy have been the main focus of our operations to date, but we are currently expanding aggressively into Austria as well. There is still a great deal of catching up to do in terms of PV there. Our subsidiary Jenabatteries, a spin-off from the University of Jena, also deserves special attention; it possesses revolutionary storage technology for metal-free redox flow batteries, backed by strong international patent protection.

You can read the entire interview here.

The owner of this website is committed to accessibility and inclusion. Please report any issues you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to improve accessibility.